Removal of smaller crane re-scheduled
The removal of the smaller crane scheduled for the 16th February 2009 was cancelled as a result of inclement weather. The builders have re-scheduled this operation for Monday 23rd February 2009. This will require a mobile crane to be set up in Gloucester Street. This crane will require the full width of the street throughout the operation. Prior to 5am on February 23rd, the street will need to be clear of all parked vehicles. The street will be closed to all vehicle traffic from 5am to 5pm on this day. Security guards will be arranged to assist residents as required. Built and YHA apologise for any inconvenience and appreciate the co-operation of residents and workers in the area throughout this operation.